Jump to content

F3 (Istanbul funicular)

Coordinates: 41°03′42″N 28°35′34″E / 41.0618°N 28.5928°E / 41.0618; 28.5928
From Wikipedia, the free encyclopedia
(Redirected from F3 (Istanbul Metro))
F3 Vadistanbul–Seyrantepe
Overview
StatusOperating
OwnerVadistanbul[1][failed verification]
LocaleIstanbul, Turkey
Termini
Stations2
Service
TypeFunicular
SystemIstanbul Metro
Route numberF3
Operator(s)Vadistanbul[citation needed]
History
Opened29 October 2017; 7 years ago (2017-10-29)
Technical
Line length0.75 km (0.47 mi)
Number of tracks1
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map

Line F3
Vadistanbul
Seyrantepe Line M2

The F3, also known as the Vadistanbul Monorail (Turkish: Vadistanbul Havaray, meaning Vadistanbul Air-rail) and officially referred to as the F3 Vadistanbul-Seyrantepe funicular line (Turkish: F3 Vadistanbul-Seyrantepe füniküler hattı), is a 750 m (2,460 ft) long funicular railway in Sarıyer, Istanbul.[2] The line is one of four funicular railways in Turkey, all of them in Istanbul, and is the only one that operates above ground. Because the F3 runs along a concrete viaduct, it has been advertised as a Monorail even though it is technically a funicular railway. The route runs between Vadistanbul and Seyrantepe, where connection to the M2 line is available.[citation needed]

The F3 was opened on 29 October 2017.[citation needed]

Overview

[edit]
Seyrantepe entrance

The F3 route runs in southern Sarıyer, just west of Maslak. The large majority of the route is elevated with a concrete viaduct and consists of two stations. The northwest terminus of the F3, Vadistanbul station, is located within a glass Spheroid structure that connects to the 2nd floor of the Vadistanbul Shopping Center.[3] The southeast terminus, Seyrantepe station, is located underground on the northern side of the O-2 expressway. A tunnel underneath the expressway connects to the M2 station.[4] The route is mostly single track, except for a short 147 m (482 ft) long double-track section in the middle allowing trains to pass one another. The total construction cost of the line was 15 million.[4]

Line

[edit]
No Station District Transfer Type Notes
1 Seyrantepe Sarıyer Line M2 (Seyrantepe)
İETT Bus: 27SE, 41SM, 41ST, 62H, 65A
Viaduct Rams Park
2 Vadistanbul İETT Bus: 47L, 50D, 50H, 62H Vadistanbul Shopping Center

References

[edit]
  1. ^ "Vadistanbul Mall".
  2. ^ "Vadistanbul havaray hattı Mart 2017 de hizmete giriyor". rayhaber.com (in Turkish). 6 December 2016. Retrieved 4 January 2018.
  3. ^ "Vadistanbul Havaray projesi geliyor!". emlakkulisi.com (in Turkish). 21 August 2015. Retrieved 4 January 2018.
  4. ^ a b "Vadistanbul Havaray hattı açılıyor!". emlakkulisi.com (in Turkish). 14 September 2017. Retrieved 4 January 2018.


41°03′42″N 28°35′34″E / 41.0618°N 28.5928°E / 41.0618; 28.5928