George Vari Engineering and Computing Centre
George Vari Engineering and Computing Centre | |
---|---|
General information | |
Location | Toronto, Ontario |
Address | 245 Church St. |
Coordinates | 43°39′28″N 79°22′38″W / 43.6577°N 79.3773°W |
Completed | 2004 |
Inaugurated | 2005 |
Cost | $45 million |
Owner | Faculty of Engineering, Architectural Science, Toronto Metropolitan University |
Technical details | |
Floor count | 4 |
Design and construction | |
Architecture firm | Moriyama & Teshima Architects |
The George Vari Engineering and Computing Centre is a 4-story building that is part of Toronto Metropolitan University in Toronto, Ontario, Canada.
Initially, in 2000, Santiago Calatrava proposed that the engineering building be 33 floors. The cost was $90 million and $25 million over the university's budget.[1]
Completed in 2004 by Moriyama & Teshima Architects, the state-of-the-art building cost $45 million to complete.
The building houses the Faculty of Engineering and Architectural Science Dean's Office, the First Year Engineering Office[2] and the offices for the Departments of Aerospace Engineering;[3] Electrical, Computer, and Biomedical Engineering;[4] Computer Science;[5] and Mathematics.[6]
The building was officially renamed in 2005 as the George Vari Centre for Computing and Engineering after a gift from George and Helen Vari.
References
[edit]- ^ "Don't fuck this up", The Eyeopener, April 8, 2008
- ^ "First-Year Engineering Office". Ryerson University. Retrieved September 18, 2019.[permanent dead link ]
- ^ "Undergraduate". Ryerson University. Retrieved September 18, 2019.
- ^ "FACULTY & STAFF- Department of Electrical, Computer & Biomedical Engineering - Ryerson". Ryerson University. Retrieved September 18, 2019.
- ^ "Department of Computer Science". Ryerson University. Retrieved September 18, 2019.
- ^ "Department of Mathematics". Ryerson University. Retrieved September 18, 2019.
External links
[edit]- Ryerson Centre for Computing and Engineering
- Timelapse movie of the construction
- Photographs of the construction