Line 3 (Changchun Rail Transit)
Line 3 | |
---|---|
Overview | |
Status | Operational |
Owner | Changchun |
Locale | Changchun, Jilin, China |
Termini | |
Stations | 34 |
Service | |
Type | Light Rail |
System | Changchun Rail Transit |
Services | 2 |
Operator(s) | Changchun Rail Transit Corporation |
Depot(s) | Huguang Road Depot Ski Resort Depot |
Rolling stock | Changchun Light Rail:3000/3500 Stock/4000 Stock |
History | |
Opened | 30 October 2002 |
Technical | |
Line length | 34.3 km (21.31 mi) |
Number of tracks | 2 |
Character | Underground, at-grade and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead line, 750 V DC |
Operating speed | 70 km/h |
Line 3 of the Changchun Rail Transit (Chinese: 长春轨道交通3号线; pinyin: Chángchūn Guǐdào Jiāotōng Sān Hào Xiàn) is a light rail line running from northwest to southeast Changchun. It was opened on 30 October 2002. Line 3 was later extended on 26 December 2006[1] and 31 December 2021. This line is currently 34.3 km (21.3 mi) long with 34 stations in operation.
Opening timeline
[edit]Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Changchun Railway Station — Weiguang Street | 30 October 2002 | 14.9 km (9.26 mi) | 17 | Phase 1 |
Weixing Square — Changchun Movie Wonderland | 26 December 2006 | 17.0 km (10.56 mi) | 16 | Phase 2 |
Weiguang Street — Weixing Square | 3 April 2007 | n/a | connection of Phase 1 and 2 | |
Furong Bridge | 28 November 2017 | -1 | (temporary closure) | |
Changchun Railway Station — Huxi Bridge | 8 March 2021 | -6 | ||
Huxi Bridge — Puppet Regime Palace Museum | 31 December 2021 | 2.4 km (1.49 mi) | 6 | East extension |
Xi'an Bridge | 12 May 2023 | 1 | infill stations resumed | |
Furong Bridge | 30 May 2023 | 1 |
During the temporary closure of Changchun Railway Station — Huxi Bridge section, Liaoning Road station has permanently abandoned due to original station being too close to new Furong Bridge Station and new Changchun Railway Station,[2] became the second case in China where a rapid transit station abandoned after Xinhualu of Tianjin line 1 on 9 December 2001.
Future development
[edit]A southern extension from Changchun Movie Wonderland to No.59 Middle School is under construction.[3]
Stations
[edit]Service route |
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|---|
English | Chinese | Station | Total | ||||
● | Puppet Regime Palace Museum | 伪满皇宫 | 4 | — | 0.00 | Kuancheng / Nanguan | |
● | East Square | 东广场 | 1.30 | 1.30 | Kuancheng | ||
● | Changchun Railway Station | 长春站 | CJ ~ JH CB ~ BA CCT 1 |
1.20 | 2.50 | ||
● | Furong Bridge | 芙蓉桥 | 1.40 | 3.90 | Kuancheng / Luyuan | ||
● | Xi'an Bridge | 西安桥 | 1.20 | 5.10 | Chaoyang / Luyuan | ||
● | Nanchang Road | 南昌路 | 0.65 | 5.75 | |||
● | Chaoyang Bridge | 朝阳桥 | 0.65 | 6.40 | |||
● | Jiefang Overpass | 解放桥 | 2 | 1.00 | 7.40 | ||
● | Huxi Bridge | 湖西桥 | 0.90 | 8.30 | Chaoyang | ||
● | Kuanping Bridge | 宽平桥 | Trams 54 and 55 | 0.95 | 9.25 | ||
● | Fusong Road | 抚松路 | 1.05 | 10.30 | |||
● | Mengjiatun | 孟家屯 | CET 7 | 0.90 | 11.20 | ||
at-grade crossing (Huguang Road) | |||||||
● | Huguang Road | 湖光路 | 0.85 | 12.05 | |||
● | Diantai Street | 电台街 | 5 | 1.60 | 13.65 | ||
● | Qianjinxi | 前进西 | 0.70 | 14.35 | |||
● | Qianjin Street | 前进大街 | 0.50 | 14.85 | |||
at-grade crossing (Weiming Street) | |||||||
● | Weiming Street | 卫明街 | 0.75 | 15.60 | |||
● | Weiguang Street | 卫光街 | 1.05 | 16.65 | Chaoyang / Nanguan | ||
at-grade crossing (Weiguang Street) | |||||||
● | Weixing Square | 卫星广场 | 1 | 0.65 | 17.30 | ||
● | Yatai Overpass | 亚泰立交桥 | 1.25 | 18.90 | Nanguan | ||
● | Yitong River | 伊通河 | 0.85 | 19.75 | |||
● | Vocational Institute of Technology | 职业学院 | 4 | 1.35 | 21.10 | ||
● | Jilin TV & Radio Center | 吉林广电 | 1.05 | 22.15 | |||
● | Conference & Exhibition Center | 会展中心 | 0.90 | 23.05 | |||
● | Shiji Square | 世纪广场 | 1.10 | 24.15 | |||
● | Jinxin Street | 金鑫街 | 1.55 | 25.70 | |||
● | Boshuo Road | 博硕路 | 0.85 | 26.55 | |||
● | Jinhe Street | 金河街 | 1.20 | 27.75 | |||
● | Agricultural Expo Garden | 农博园 | 0.95 | 28.70 | |||
● | Jingyuetan National Park | 净月潭公园 | 1.30 | 30.00 | |||
● | Zishan Road | 紫杉路 | 1.50 | 31.50 | |||
● | Baoxiang Street | 宝相街 | 1.00 | 32.50 | |||
● | Ski Resort | 滑雪场 | 1.25 | 33.75 | |||
at-grade crossing (Liuying Dong(East) Road) | |||||||
● | Changchun Movie Wonderland | 长影世纪城 | 6 | 0.55 | 34.30 | ||
See also
[edit]Notes
[edit]References
[edit]- ^ 12月26日长春轻轨二期将运行 可能采用阶梯票价. 搜狐新闻 (in Chinese). Archived from the original on 2014-02-02. Retrieved 2012-10-04.
- ^ "2021年12月31日长春轨道交通3号线东延线通车运营". Sina. 30 December 2021.
- ^ "长春轨道交通3号线南延工程最新进展". Retrieved 2024-02-06.