Line 5 (Nanjing Metro)
Appearance
Line 5 | |||
---|---|---|---|
5 | |||
Overview | |||
Status | In operation | ||
Locale | Jiangning district Nanjing, Jiangsu | ||
Termini | |||
Stations | 9 | ||
Service | |||
Type | Rapid transit | ||
History | |||
Opened | 31 March 2024[1] | ||
Technical | |||
Line length | 12.9 km (8.0 mi)[2] (in operation) | ||
Number of tracks | 2 | ||
Character | Underground | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
Operating speed | 80 km/h (Maximum) | ||
|
Line 5 is a northwest–southeast line in Nanjing Metro. The line color is yellow, and it was first opened on March 31, 2024.[1]
Opening timeline
[edit]Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Wenjinglu — Jiyindadao | 31 March 2024 | 12.9 km (8.0 mi)[2] | 9 | South section (Jiangning Section) |
Stations
[edit]Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Jiyindadao | 吉印大道 | S1 | 0.000 | - | Jiangning |
Jiulonghunan | 九龙湖南 | 1.768 | 1.768 | ||
Chengxindadao | 诚信大道 | 3 | 4.863 | 3.095 | |
Qianzhuang | 前庄 | 6.060 | 1.197 | ||
Keninglu | 科宁路 | 8.485 | 2.425 | ||
Zhushanlu | 竹山路 | 1 [i] | 9.431 | 0.946 | |
Xintinglu | 新亭路 | 10.615 | 1.184 | ||
Dongshan | 东山 | 11.800 | 1.185 | ||
Wenjinglu | 文靖路 | 12.44 | 0.640 | ||
Dongshanxiangzhangyuan | 东山香樟园 | 14.313 | 1.060 | ||
Shenjiying | 神机营 | 17.047 | 2.734 | Qinhuai | |
Dajiaochang | 大校场 | 10 | 17.98 | 0.933 | |
Qiqiaoweng | 七桥瓮 | 19.276 | 1.296 | ||
Shimenkan | 石门坎 | 20.207 | 0.931 | ||
Guanghuamen | 光华门 | 6 | 21.758 | 1.551 | |
Tongjimen | 通济门 | 22.755 | 0.997 | ||
Fuzimiao | 夫子庙 | 3 | 24.124 | 1.369 | |
Sanshanjie | 三山街 | 1 | 24.887 | 0.763 | |
Chaotiangong | 朝天宫 | 26.626 | 1.739 | ||
Shanghailu | 上海路 | 2 | 27.539 | 0.913 | Qinhuai/Gulou |
Wutaishan | 五台山 | 28.591 | 1.052 | Gulou | |
Yunnanlu | 云南路 | 4 | 29.665 | 1.074 | |
Qinchunguangchang | 青春广场 | 30.739 | 1.074 | ||
Hongqiao | 虹桥 | 31.766 | 1.027 | ||
Fujianlu | 福建路 | 7 | 32.474 | 0.708 | |
Yancangqiao | 盐仓桥 | 33.625 | 1.151 | ||
Xiaguan | 下关 | 9 | 34.513 | 0.888 | |
Jinhaisi | 静海寺 | 35.257 | 0.744 | ||
Nanjingxi Railway Station | 南京西站 | 35.891 | 0.634 | ||
Fangjiaying | 方家营 | 36.9 | 1.009 |
- ^ Virtual transfer with line 1 – For passengers transfer within 30 minutes after exiting with a Passenger Code or a Public Transit Card, continuous billing is adopted; Passengers with token need to transfer just by putting the ticket into recycling port and afterwards repurchase a ticket; Passengers with UnionPay Quick Pass Card headed by 62 or Mobile Pay can transfer just by tapping in again after exiting.
References
[edit]- ^ a b "南京地铁5号线南段3月31日中午12时开通初期运营". 扬子晚报网 (in Chinese). 30 March 2024. Retrieved 30 March 2024.
- ^ a b "刚刚,地铁5号线南段通车!". www.xhby.net.