Jump to content

Shachong station

Coordinates: 23°05′05″N 113°14′13″E / 23.084722°N 113.236944°E / 23.084722; 113.236944
From Wikipedia, the free encyclopedia
Shachong

沙涌
Guangzhou Metro
Line 11 platform
Chinese name
Chinese沙涌站
Transcriptions
Standard Mandarin
Hanyu PinyinShāchōng Zhàn
Yue: Cantonese
Jyutpingsaa1cung1 zaam6
General information
LocationWest side of intersection of Huanhua Road (浣花路) and Fangcun Avenue East (芳村大道东), Chongkou Subdistrict
Liwan District, Guangzhou, Guangdong
China
Coordinates23°05′05″N 113°14′13″E / 23.084722°N 113.236944°E / 23.084722; 113.236944
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Guangfo line
     Line 11
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code1122 GF20
History
Opened28 December 2015; 9 years ago (2015-12-28) (Guangfo line)
28 December 2024; 42 days ago (2024-12-28)
(Line 11)
Services
Preceding station Guangzhou Metro Following station
Hedong Guangfo line Shayuan
towards Lijiao
Hedong East
Outer Circle
Line 11 Dachongkou
Inner Circle

Shachong station (Chinese: 沙涌站), formerly Fangcun Dadao station (芳村大道站) when planning,[1] is an interchange station between the Guangfo Metro (Guangfo line) and Line 11 of the Guangzhou Metro.[2] It is located at the underground of the junction of Huanhua Road (浣花路) and Fangcun Avenue East (芳村大道东) in Fangcun, Liwan District, Guangzhou.[3] It started operations on 28 December 2015.[4] The Line 11 station opened on 28 December 2024.[5]

Station layout

[edit]
G - Exits A-E
L1
Concourse
 11  Lobby Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities
 Guangfo  Lobby Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities
L2
Mezzanine
Passenger flow distribution hall ( 11 ) Connection between concourse and platforms
Transfer passageway Connection between  11  passenger flow distribution hall and  Guangfo  platforms
Guangfo line Mezzanine Station equipment
L3
Platforms
Line 11 Mezzanine Station equipment
Platform 2 arrow for L  Guangfo  towards Xincheng Dong (Hedong)
Island platform, doors will open on the left
Platform 1  Guangfo  towards Lijiao (Shayuan) arrow for R
L4 Platforms Platform 4 arrow for L  11  Inner Circle (Dachongkou)
Island platform, doors will open on the left
Platform 3  11  Outer Circle (Hedong East) arrow for R

Exits

[edit]

The station opened Exits A and C in its initial opening stage. Exit B was opened on 25 June 2019 and temporarily closed between 13 August 2022 and 27 December 2024 to accommodate the construction of the Line 11 station.[6] Exit B was expanded by connecting to the Line 11 station, and after the canopy of the exit was rebuilt it was reopened when Line 11 opened. At the same time, after the opening of the station of Line 11, new exits D and E were added.

Exit letter Gallery Exit location Nearby
A Huanhua Road East Guangzhou True Light Middle School, Huanhua East Road Public Bus Stop (Eastbound)
B Fangcun Avenue East
C Fangcun Avenue East Liwan District Children's Park, Huanhua East Road Public Bus Stop (Westbound), Hedong Xincun Public Bus Stop (Southbound)
D Fangcun Avenue East Guangzhong Ferry Terminal Public Bus Stop (Southbound)
E Fangcun Avenue East Hedong Xincun Public Bus Stop (Northbound)
[edit]

History

[edit]
Reserved transfer interface to Line 11 platforms at the eastern side of Guangfo line platforms (2017)

Planning and construction

[edit]

In the 2003 plan, the station was planned as one of the stations of the Guangzhou-Foshan Metro (Guangfo Metro), and Fangcun Dadao Station was used as the station during the planning and construction of the project.[7] In the original plan, the station was located in the north-northwest area of its current location, but it was later changed to be located next to the stream near the intersection of Huanhua Road and Fangcun Avenue.

In 2011, in response to the planning of a Line 11 station at Shachong,[8] the Guangfo line Station was redesigned, the station was widened, and part of the structure was planned as a transfer passageway on the second floor to make good use of the station space.

The construction of the Guangfo line station started on 24 September 2009, and the main structure was topped out on 14 January 2013. On 14 May 2017, the station site of Line 11 was enclosed together with Fangcun Avenue East Station (now Dachongkou),[9] and construction of the envelope structure was completed in May 2020.[10] The "three powers" transfer was completed on 3 July 2024.[11]

In order to facilitate the connection to the station part of Line 11, on the eve of the opening of Line 11, the north part of the paid area of the Guangfo line concourse was redivided, the number and location of the turnstiles at the interface connecting to the Line 11 station were adjusted, and the elevators originally divided into the connecting platforms outside the paid area were included in the paid area.

Operation

[edit]

On 28 December 2015, the station opened on the Guangfo line.[12]

On 28 December 2024, the Line 11 station was opened.[13]

References

[edit]
  1. ^ 广佛地铁22站点大亮相 (in Simplified Chinese). 2003-07-09. Archived from the original on 2016-06-04. Retrieved 2009-04-01.
  2. ^ Guangzhou - Foshan rapid rail starts construction June 28
  3. ^ 广佛线广州段十站位置风格确定 (in Simplified Chinese). 2007-06-29.[permanent dead link]
  4. ^ 广佛线西朗至燕岗段月底通地铁 (in Chinese). Xinhua. 2015-12-15. Archived from the original on December 25, 2015. Retrieved 2015-12-24.
  5. ^ 吴多 (2024-12-27). ""环"游广州|下一站,荔湾·沙涌" ["Circle" Tour of Guangzhou - Next stop, Liwan Shachong]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2025-01-03. Retrieved 2025-02-05.
  6. ^ 陈泽云 (2019-06-26). "广佛线沙涌站B出口开通使用" [Exit B of Shachong Station on the Guangzhou-Foshan Line is open for use]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 2021-02-28. Retrieved 2025-02-05.
  7. ^ "广佛地铁22站点大亮相" [22 Guangzhou-Foshan Metro Stations Debut]. Guangzhou Daily (in Simplified Chinese). 2003-04-04. Archived from the original on 2016-06-04. Retrieved 2025-02-05.
  8. ^ "广州地铁十一号线有望年底开工 将串联五区" [Guangzhou Metro Line 11 is expected to start construction by the end of the year and will connect five districts]. Nanfang Daily (in Simplified Chinese). 2014-07-31. Archived from the original on 2021-06-07. Retrieved 2025-02-05 – via China News Network.
  9. ^ 刘勇 (2017-04-28). "地铁环线十一号线沙涌站、芳村大道东站29日起围蔽施工" [Metro Loop Line 11 Shayong Station and Fangcun Avenue East Station will be fenced off for construction starting on the 29th]. Golden Sheep Network (in Simplified Chinese). Archived from the original on 2021-06-07. Retrieved 2025-02-05 – via Sohu.
  10. ^ "【大干一百天】广州地铁十一号线沙涌站完成围护结构钻孔桩施工" [[Work hard for 100 days] Construction of bored piles for retaining structure of Shachong Station of Guangzhou Metro Line 11 completed]. China Railway Tunnel No. 3 (in Simplified Chinese). 2020-05-28. Archived from the original on 2023-05-10. Retrieved 2025-02-05 – via Official WeChat Account.
  11. ^ 严艺文 (2024-07-04). "广州地铁十一号线轨行区及首批车站实现"三权"移交" [Guangzhou Metro Line 11 track area and the first batch of stations have achieved the "three rights" transfer]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 2024-07-04. Retrieved 2025-02-05.
  12. ^ 罗苑尹 (2015-12-18). "广佛地铁开通首日 早高峰人流不大" [Guangzhou-Foshan Metro opened on the first day with small passenger flow during the morning rush hour]. Southern Metropolis Daily (in Simplified Chinese). Archived from the original on 2023-05-09. Retrieved 2025-02-05 – via Sina Corporation.
  13. ^ 李天研 (2024-12-28). "滚动更新|多图+视频!街坊"尝鲜"地铁十一号线首发列车" [Rolling update - Multiple pictures + videos! Neighborhood "tastes" the first train of Metro Line 11]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-12-28. Retrieved 2025-02-05.