Jump to content

Yangang station

Coordinates: 23°04′31″N 113°16′19″E / 23.075142°N 113.271988°E / 23.075142; 113.271988
From Wikipedia, the free encyclopedia
Yangang

燕岗
Guangzhou Metro
Line 11 platform 4 (Inner Circle platform)
Chinese name
Simplified Chinese燕岗站
Traditional Chinese燕崗站
Transcriptions
Standard Mandarin
Hanyu PinyinYāngǎng Zhàn
Yue: Cantonese
Jyutpingjin3gong1 zaam6
General information
LocationIntersection of Industrial Avenue Middle (工业大道) and Quantang Road (泉塘路), Nanshitou Subdistrict
Haizhu District, Guangzhou, Guangdong
China
Coordinates23°04′31″N 113°16′19″E / 23.075142°N 113.271988°E / 23.075142; 113.271988
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Guangfo line
     Line 11
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code1125 GF22
History
Opened28 December 2015; 9 years ago (2015-12-28) (Guangfo line)
28 December 2024; 42 days ago (2024-12-28)
(Line 11)
Services
Preceding station Guangzhou Metro Following station
Shayuan Guangfo line Shixi
towards Lijiao
Jiangtai Road
Outer Circle
Line 11 Diyuan
Inner Circle

Yangang Station (Chinese: 燕岗站), formerly Jiangyan Lu Station (江燕路站),[1][2] is an interchange station between the Guangfo Metro (Guangfo line) and Line 11 of the Guangzhou Metro.[3] It is located under Gongye Avenue (工业大道) in the Haizhu District of Guangzhou.[4] The Guangfo line station opened on 28 December 2015.[5] It was the eastern terminus before the remaining section to Lijiao opened on 28 December 2018. The Line 11 station opened on 28 December 2024.[6]

Station layout

[edit]

Line 11

[edit]
G - Exits F & H
L1
Concourse
Transfer passageway Transfer to  Guangfo 
 11  Lobby Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities
L2 - Station equipment
L3
Platforms
Platform 4 arrow for L  11  Inner Circle (Diyuan)
Island platform, doors will open on the left
Platform 3  11  Outer Circle (Jiangtai Road) arrow for R

Guangfo line

[edit]
G - Exits B & D
L1
Concourse
 Guangfo  Lobby Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities, Transfer to  11 
L2
Platforms
Platform 2 arrow for L  Guangfo  towards Xincheng Dong (Shayuan)
Island platform, doors will open on the left
Platform 1  Guangfo  towards Lijiao (Shixi) arrow for R

Exits

[edit]
Exit letter Gallery Exit location Nearby
B Industrial Avenue Middle Guangzhi Road, Guangzhi North 1st Road, Nanji Road, West Campus of The Second Affiliated Hospital of Guangzhou Medical University, Zhichang (Metro Yangang Station) Public Bus Stop (Southbound), Guangzhi Road Public Bus Stop (Westbound), Poly Garden (Nanshitou) Public Bus Station (Southbound Stand 1)
D Industrial Avenue Middle Quantang Road, Jiangyan Road, Zhichang (Metro Yangang Station) Public Bus Stop (Northbound Stands 1 and 2)
F Quantang Road
H Industrial Avenue Middle Quantang Road, Zhichang (Metro Yangang Station) Public Bus Stop (Northbound Stands 1 and 2)
[edit]

History

[edit]

In the 2003 subway planning plan, the Central and South sections of the Industrial Avenue were identified as the lines of the Guangzhou section of the Guangzhou-Foshan Metro (Guangfo Metro), and the station appeared as one of the intermediate stations, in which the location was roughly the same as the current one. Subsequently, in the planning of Line 11, there was also a station named Yangang. Although the stations of the two lines was named Yangang at the time, they could only interchange at Shachong Station. The No. 11 environmental review, published in January 2014, showed that the two lines were designed to be far apart from each other at the station in Yanzigang and could not provide an interchange. However, in July 2014, the Guangzhou Municipal Planning Bureau replied to public inquiries that the two lines would be equipped with interchanges at the station,[7] and the Guangzhou Municipal Urban and Rural Construction Commission issued the "Notice on the Construction of Guangzhou Rail Transit Line 11" on September 4, which also added one interchange station compared with the environmental review.[8] Since then, the station has also been adjusted to Quantang Road with the line position, close to the Guangfo line station. At this point, it was officially confirmed that Yangang Station would become one of the interchange stations between Guangfo line and Line 11.

The main station structure of the Guangfo line station was topped out in December 2013. The station started the operation and commissioning stage on 1 July 2015, and opened on December 28 of the same year.[9] Affected by the obstruction of the construction of Lijiao Station, this station was the temporary eastern terminus of Guangfo line for three years.[10] It was not until 28 December 2018 that the remaining section of the rear section of Guangfo line (Yangang to Lijiao) was opened, and this station became a halfway station.[11]

The Line 11 station was topped out on 13 August 2020.[12] The "three powers" transfer was completed on 30 July 2024,[13] and on December 28, the station was put into use with the opening of Line 11.[14]

References

[edit]
  1. ^ 广佛地铁广州段多个站名已变更 (in Simplified Chinese).
  2. ^ 广佛地铁22站点大亮相 (in Simplified Chinese). 2003-07-09.
  3. ^ Guangzhou - Foshan rapid rail starts construction June 28
  4. ^ 广佛线广州段十站位置风格确定 (in Simplified Chinese). 2007-06-29.
  5. ^ 广佛线西朗至燕岗段月底通地铁 (in Simplified Chinese). Xinhua. 2015-12-15. Archived from the original on December 25, 2015. Retrieved 2015-12-24.
  6. ^ 陈钧圣 (2024-12-27). ""环"游广州| 下一站,海珠·燕岗" ["Circle" Tour of Guangzhou - Next stop, Haizhu Yangang]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2025-01-02. Retrieved 2025-02-04.
  7. ^ "地铁11号线在燕岗站有换乘吗?" [Is there a transfer at Yangang Station on Metro Line 11?]. Guangzhou Urban Planning Bureau (in Simplified Chinese). 2014-07-16. Archived from the original on 2014-07-25. Retrieved 2025-02-04.
  8. ^ "广州市轨道交通11号线工程建设通告(征求意见稿)" [Guangzhou Metro Line 11 Construction Notice (Draft for Comments)] (doc). Guangzhou Urban and Rural Construction Committee (in Simplified Chinese). 2014-09-04. Archived from the original (doc) on 2014-09-07. Retrieved 2025-02-04.
  9. ^ 李天研 (2015-07-02). "年底开通指日可待" [Opening is just around the corner]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2023-05-09. Retrieved 2025-02-04 – via Sina Corporation.
  10. ^ 罗苑尹 (2015-12-18). "广佛地铁开通首日 早高峰人流不大" [Guangzhou-Foshan Metro opened on the first day with small passenger flow during the morning rush hour]. Southern Metropolis Daily (in Simplified Chinese). Archived from the original on 2023-05-09. Retrieved 2025-02-04 – via Sina Corporation.
  11. ^ 郭苏莹 (2018-12-28). "今日广州地铁三线齐发 搭乘地铁快车38分钟可达从化" [Today, Guangzhou Metro's three lines are launched simultaneously. It takes 38 minutes to reach Conghua by taking the subway express train]. Information Times (in Simplified Chinese). Archived from the original on 2019-06-03.
  12. ^ "广州地铁11号线燕岗站主体封顶" [Guangzhou Metro Line 11 Yangang Station tops out]. China Railway Guangzhou Engineering Bureau (in Simplified Chinese). 2020-08-19. Archived from the original on 2023-05-09. Retrieved 2025-02-04 – via Official WeChat Account.
  13. ^ "广州地铁十一号线项目燕岗站顺利完成"三权"移交" [Guangzhou Metro Line 11 project Yangang Station successfully completed the "three rights" transfer]. China Railway Guangzhou Bureau Shenzhen Company (in Simplified Chinese). 2024-07-31. Archived from the original on 2024-07-31. Retrieved 2025-02-04 – via Official WeChat Account.
  14. ^ 李天研 (2024-12-28). "滚动更新|多图+视频!街坊"尝鲜"地铁十一号线首发列车" [Rolling update - Multiple pictures + videos! Neighborhood "tastes" the first train of Metro Line 11]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-12-28. Retrieved 2025-02-04.