Jump to content

Yellow Line (Indore Metro)

From Wikipedia, the free encyclopedia

Yellow Line
Overview
StatusUnder construction
LocaleIndore, Madhya Pradesh, India
Termini
  • Gandhi Nagar
  • Radisson Square (further extended to Airport)
Stations
  • 29
  • 16 (Under construction)
Service
TypeRapid transit
SystemIndore Metro
Operator(s)Madhya Pradesh Metro Rail Corporation Limited
Rolling stockAlstom[1]
Technical
Line length33.53 km (20.83 mi) (Planned)
16.21 km (10.07 mi) (Under construction)
17.32 km (10.76 mi) (Approved)
CharacterElevated & Underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed
  • 90 km/h (56 mph) (Top)
  • 32 km/h (20 mph) (average)
Route map

Gandhi Nagar
Super Corridor 6
Super Corridor 5
Super Corridor 4
Super Corridor 3
Super Corridor 2
Super Corridor 1
Super Corridor 1
Bhawarshala Square
MR 10 Road
ISBT / MR 10 Flyover Bus interchange
Chandragupta Square
Hira Nagar
Bapat Square
Meghdoot Garden
Vijay Nagar Square
Radisson Square
Mumtaj Bag Colony
Khajrana Square
Bengali Square
Patrakar Colony
Palasia Square
High Court
Indore Railway Station Mainline rail interchange
Rajwada
Chota Ganpati
Bada Ganpati
Ramachandra Square
BSF/Kalani Nagar
Airport Devi Ahilya Bai Holkar Airport

The Yellow Line (Hindi: येल्लो लाइन) is an under-construction metro rail line of the Indore Metro, a rapid transit system in Indore, Madhya Pradesh, India. This line consists of 29 metro stations from Gandhi Nagar to Airport with a total distance of 33.53 km. However the priority section from Gandhi Nagar to Radisson Square is under-construction with a distance of 16.21 km and it is expected to be operational in March 2024.[2][3]

List of stations

[edit]

Following is a list of stations on this route:

Yellow Line
# Station Name Opening Connections Layout
English Hindi
1 Gandhi Nagar गांधी नगर Under construction None Elevated
2 Super Corridor 6 सुपर कॉरिडोर 6 Under construction None Elevated
3 Super Corridor 5 सुपर कॉरिडोर 5 Under construction None Elevated
4 Super Corridor 4 सुपर कॉरिडोर 4 Under construction None Elevated
5 Super Corridor 3 सुपर कॉरिडोर 3 Under construction None Elevated
6 Super Corridor 2 सुपर कॉरिडोर 2 Under construction None Elevated
7 Super Corridor 1 सुपर कॉरिडोर 1 Under construction None Elevated
8 Bhawarshala Square भावरशाला चौराहा Under construction None Elevated
9 MR 10 Road एम आर 10 रोड Under construction None Elevated
10 ISBT/MR 10 Flyover आई एस बी टी / एम आर 10 फ्लाईओवर Under construction ISBT Indore Elevated
11 Chandragupta Square चंद्रगुप्त चौक Under construction None Elevated
12 Hira Nagar हीरा नगर Under construction None Elevated
13 Bapat Square बापट चौराहा Under construction None Elevated
14 Meghdoot Garden मेघदूत गार्डन Under construction None Elevated
15 Vijay Nagar Square विजय नगर चौराहा Under construction None Elevated
16 Radisson Square रैडिसन स्क्वायर Under construction None Elevated
17 Mumtaj Bag Colony मुमताज बाग कॉलोनी TBC None Elevated
18 Khajrana Square खजराना चौराहा TBC None Elevated
19 Bengali Square बंगाली चौराहा TBC None Elevated
20 Patrakar Colony पत्रकार कॉलोनी TBC None Elevated
21 Palasia Square पलासिया चौराहा TBC None Elevated
22 High Court हाई कोर्ट TBC None Elevated
23 Indore Railway Station इंदौर रेलवे स्टेशन TBC Indore Railway Station Elevated
24 Rajwada राजवाड़ा TBC None Underground
25 Chota Ganpati छोटा गणपति TBC None Underground
26 Bada Ganpati बड़ा गणपति TBC None Underground
27 Ramachandra Square रामचन्द्र चौराहा TBC None Underground
28 BSF/Kalani Nagar बी एस एफ / कलानी नगर TBC None Underground
29 Airport एयरपोर्ट TBC Devi Ahilya Bai Holkar Airport Underground

See also

[edit]

References

[edit]
  1. ^ "Alstom commences production of rolling stock for Bhopal, Indore Metro Project". www.aninews.in. Retrieved 22 August 2023.
  2. ^ "All You Need to Know About Bhopal and Indore Metro Projects". www.metrorailnews.in. 31 March 2023. Retrieved 22 August 2023.
  3. ^ "Bhopal, Indore Metro Likely to Start Operations By May 2024: MP CM Shivraj Singh Chouhan". www.news18.com. 27 August 2023. Retrieved 29 September 2023.